Key takeaways
- According to AGC, steel mill product prices rose 27.6% between September 2025 and September 2026, due in part to the 50% tariffs.
- Typical settlements for supplier payables are 25 to 50%, and 30 to 60% for credit cards and lines of credit (both typical reported ranges).
- Construction debt settlements typically last 3 to 18 months and are negotiated with each creditor individually, all while you keep working on jobs.
- Here's an example: two merchant cash advances take up 19.1% of $250,000 monthly deposits, just shy of the danger zone.
- A general indemnity agreement with your surety is a separate personal obligation that won't disappear in a debt settlement.
Short answer
Yes, contractors can settle MCA, supplier, credit card, and equipment deficiency debts while keeping their projects moving forward. Their payments only change with a written agreement with each creditor. (Reported typical ranges below are not a guarantee.) Suppliers: 25 to 50%. Credit cards and lines of credit: 30 to 60%. Equipment deficiency: 30 to 60% of deficiency. The process takes 3 to 18 months. Steel mill prices are up 27.6% in one year. (Ironically, under surety indemnity, owners may have personal liability.)
Why are so many construction businesses struggling with MCA debt right now?
Short answer
The cost of materials increased in the middle of a contract. Clients are still taking 30 to 90 days to pay and holding retainage. Steel mill product prices have increased 27.6% over the last year under 50% tariffs. Contractors that bid on the contract before the price increase often took merchant cash advances (MCA) to make up the difference. As soon as you take the advance, debits begin.
According to the AGC Construction Inflation Alert for October 2026, producer prices from September 2025 to September 2026 increased 27.6% for steel mill products, 25.2% for aluminum mill shapes, 30% for copper and brass mill shapes, and 35% for fabricated structural metal.
A lot of these cost increases are due to tariffs, the AGC reports. The 50% tariff on most imported steel and aluminum products has been in effect since June of 2025. The 50% tariff on the copper content of many imported products has been in effect since August 2025. The tariffs remain.
Business failures are increasing. U.S. Courts reports that 26,941 business bankruptcy filings occurred during the 12-month period ending June 30, 2026, an increase of 16.9%. This is across all industries. Courts do not break out how many filings there are by industry.
Cash Flow: Construction's Conundrum. You buy materials and pay your crews today. You bill the work monthly. The client pays 30 to 90 days later but holds back retainage. If your contract is for a fixed price, your business cannot absorb a spike in the cost of materials. Getting a merchant cash advance looks like a quick fix to bridge the gap. It starts coming out of your bank account the next business day.
What types of debt do construction owners usually settle?
Short answer
Construction business owners usually settle debts from merchant cash advances, materials suppliers’ balances, business credit cards, lines of credit, and equipment deficiencies after sales. Typical reported settlement ranges include 25 to 50% of balances owed to material suppliers and 30 to 60% of balances owed on business credit cards and lines of credit. Surety claims, benefit funds, and payroll taxes all play by their own set of rules.
After merchant cash advances, suppliers are often the largest unsecured creditors. Generally speaking, lumber yards, steel service centers, and electrical supply houses negotiate like other vendors. The supplier may have the ability to file a lien or bond claim on a project. Every state has different deadlines.
Equipment debt is secured debt. If you have an excavator or a lift, your lender or lessor can take that asset back in the event of default. If they do so, then any remaining balances become a negotiable deficiency after the sale. See equipment loan and lease defaults for more.
Surety claims are personal. If the surety pays on your bond, it will want you to repay the surety under a separate general indemnity agreement (GIA). The GIA is a promise the GIA signers make to the surety. The owner is often one of them.
Delinquent union benefit fund contributions rarely settle for cents on the dollar. Funds can sue for these amounts, and in some cases hold individuals liable. Payroll taxes are considered trust fund money. These should never be settled by percentage.
Below are ten common contractor debts and what is settleable and the primary risk of each.
Typical ranges have been reported for suppliers, cards, lines of credit and equipment deficiencies. None have been reported for surety claims, benefit funds and payroll taxes.
Typical reported range is not a guarantee and is not an offer.
| Debt type | Settleable? | Typical reported range | Construction risk |
|---|---|---|---|
| Merchant cash advance | Usually | 40 to 60% (Tayne Law Group) or 30 to 55% lump sum (CredibleLaw), firm-reported. See note | Notices under UCC 9-406 to general contractors or project owners. COJ in some states. |
| Materials supplier (lumber, steel, electrical supply) | Yes | 25–50% | Liens or bond claims on the project. State deadlines vary. Credit holds stop jobs. |
| Equipment loan or lease, before repossession | Only by restructure | No band | Losing the equipment mid-project. |
| Equipment deficiency, after sale | Yes | 30–60% of the deficiency | Sale and fees can be disputed. See equipment deficiency guide. |
| Business line of credit | Yes | 30–60% | Covenants with the bank, different treatment of UCC liens. |
| Business credit card | Yes | 30–60% | Personal guarantee. |
| Equipment rental company | Yes | 25–50% (vendor range) | Some rental companies may have lien or bond claim rights for your project (depending on state laws). |
| Surety indemnity claim | Case by case | No standard range | Under a general indemnity agreement, signing parties are personally liable for it. |
| Union benefit-fund contributions | Rarely | No standard range | Benefit funds can sue for delinquent contributions. Personal liability might attach in some cases. |
| Payroll tax (Form 941) | Formula only | Never a percentage | The Trust Fund Recovery Penalty can be applied to the owner personally. |
Source: Buyout MCA master settlement range table (settlement ranges by debt type). Ranges are typical reported ranges, not a guarantee. MCA figures are firm-reported ranges from Tayne Law Group, a law firm, and CredibleLaw, an attorney-referral network, not industry data. Checked Nov 2026.
How does settlement work for a construction company?
Short answer
Construction company settlement negotiates with individual creditors while projects continue. Make a list of your debts, read the contracts, and get ready to make a hardship case for your company, relying on information from the aging report, payment applications, retainage schedule and price notices from your suppliers. Payments can only be altered by agreement in writing. Normally the time is 3 to 18 months.
Start with an inventory of all your debt: MCAs, suppliers, credit cards, lines, equipment loans, and bonds. Include amounts owed and payments. Gather bank statements for the last 3 months and run a UCC search on the name of the business.
The contract for each MCA is worth review. Read for a reconciliation clause and a confession of judgment. Also check for a personal guarantee. If business receipts dropped, it may be possible to send the funder a written reconciliation request requesting the funder to reduce debit.
Build the hardship file by showing the gap in construction terms. Included should be an accounts receivable aging report, approved but unpaid pay applications, retainage schedule, and letters of price increase from supplier.
The negotiation goes one creditor at a time. Stay current with payroll taxes, insurance and bond premiums and get the surety involved early. There should be a lien waiver included in the supplier settlements.
All these settlements need to end with a written release of the guarantor and UCC-3 termination, if the lien is filed. Terminations have to be filed in 20 days of authenticated demand. See, UCC §9-513(c).
How settlement works for a construction company: 7 stages
Here is how it usually works. But there is no guarantee. The process follows the rhythm of each funder. The entire process typically takes 3 to 18 months.
- Days 1–7 Inventory every debt What happens: Create a list of the funders and creditors, the balances, the amount and frequency of debits. What you do: Pull 3 months bank statements. Conduct UCC search for the business name.
- Weeks 1–2 Read every contract What happens: Find all the reconciliation clauses, confession of judgment (COJ) clauses and personal guarantees. What you do: Know how to request MCA reconciliation. Request reconciliation in writing where permitted by the contract.
- Weeks 2–6 Build the hardship file What happens: Make a hardship file showing why the construction business is falling behind. The file should include receivables aging report, approved but unpaid pay applications, retainage schedule, supplier price increase notices and bank statements. What you do: Get your documents together, save a copy of all you send out.
- Weeks 2–12 Negotiation opens What happens: Start negotiations individually with each creditor. Any payment changes must be agreed in writing. What you do: Continue paying insurance, payroll taxes, and sales tax throughout negotiations.
- Months 2–18 Agreements, one creditor at a time What happens: Each creditor will be settled through either a lump sum or short payment plan. What you do: Be sure to read everything before you sign it. Pay exactly as written.
- Each settlement Release and lien cleanup What happens: There needs to be a release document signed, it needs to name the guarantor, and the secured party has to file the UCC-3 termination within 20 days of receiving a signed demand (UCC §9-513(c)). What you do: Send a UCC-3 demand and verify state filing.
- After Tax check on the forgiven amount What happens: The creditor may issue a 1099-C if it forgives $600 or more. An insolvent taxpayer can exclude that income by filing Form 982. What you do: Consult a CPA regarding taxes on a settled MCA.
Sources: UCC §9-513(c) · IRS Instructions for Forms 1099-A and 1099-C · Checked Nov 2026
Get a free review of your options
- Forward your contracts and 3 months of bank statements to us.
- We will evaluate your funders, liens, and your terms and legal exposure.
- You will receive a written summary of your options without obligation.
How much can a construction business save?
Short answer
The range of savings will vary based on the type of debt. Suppliers typically settle for 25 to 50%. Credit cards and lines of credit typically settle for 30 to 60%. These are reported ranges and not a guarantee. Law firm Tayne Law Group reports settlement ranges for merchant cash advances as 40 to 60%. That's a number reported by them. We have a calculator below to help you see how much of your deposits MCA debits take and a job cash gap calculator to see when this squeeze begins.
To put numbers on it, assume a contractor that deposits $250,000 per month with one MCA at $1,200 per business day and another MCA at $5,000 per week, for a total of $2,200 per day.
That is 19.1% of deposits, which is about $47,674 a month. This is tight. It is just below the 20% danger line and could easily go above it with one slow draw or a held application for payment.
Deposits of construction companies are uneven. A large draw can make deposits in a month look good, but the following month can look very thin. It is better to use a 3 month average of deposit, not your best month.
MCA savings come from a negotiated payoff. The law firm Tayne Law Group in New York has reported that MCA settlements often are 40 to 60 percent of the balance. CredibleLaw is an attorney network and they report lump sum settlements from 30 to 55% and payment plan settlements from 55 to 70%. These are ranges reported by these firms, not industry data and not a guarantee.
We have a master table of settlement ranges that will list the supported ranges, and you can see the MCA deal structure in how MCA debt settlement works.
Supplier and card settlement savings matter as well. A $40,000 balance owed to a supplier at the typical reported range of 25 to 50% would cost $10,000 to $20,000 to settle, but again, this is not guaranteed.
What happens to my equipment and job receivables during settlement?
Short answer
Your equipment belongs to you while your loan or lease is current. If you settle your unsecured debt, equipment liens remain. However, your job receivables (and especially retainage) present a bigger risk. Your funder may have a valid lien which could allow them to issue UCC 9-406 notices to a GC or owner. Some states will allow confession of judgment.
Equipment lenders are secured, and can repossess without court order in the event of a default (as long as there's no breach of the peace), (UCC §9-609). Losing a piece of equipment in the middle of a job can cost you far more than just your payment. If possible, keep these notes current.
Most merchant cash advance companies file a lien against your receivables. If you default, your funder may (if they have a valid lien) issue a UCC §9-406 to a GC or project owner, directing them to pay your funder instead. Your retainage is a receivable, and is subject to the same type of notice.
Certain MCA contracts include a confession of judgment (COJ). Some states allow a COJ to be used without filing a complete lawsuit. Read more in the state-by-state COJ guide.
A good settlement agreement should end any GC or owner notices, release any guarantor and require a UCC 3 termination upon payment. We recommend that you hold on to your signed agreement, evidence of all payments and filed UCC 3 together in the event you need it (eg. GC or bank request).
Will settlement affect my bonding or surety?
Short answer
Maybe. You should contact your surety and surety agent as early as possible. Sureties use your financial statements, work in progress reports, and lien search to establish bonding capacity. Sureties also may turn up judgments associated with your MCAs and the UCC liens. In our view, a closed settlement, complete with releases and UCC 3s, typically looks better than open lawsuits. Nonetheless, a surety indemnity agreement is a separate personal promise.
Bonding capacity is based on sureties’ confidence in a company’s financial situation. Generally, the surety will review financial statements and work-in-progress schedules, and might conduct judgments and lien searches.
Open MCA lawsuits and new UCC 1 filings are items that the underwriter may question. In general, a negotiated settlement with releases and UCC 3 terminations on file will appear better than unresolved lawsuits. This is our general view, however, and not a promise of any surety decision.
A general indemnity agreement (GIA) is separate from an MCA debt obligation. Should a surety pay on a surety bond claim, they may attempt to collect from GIA signers. Settling on an MCA debt does not change the underlying GIA.
Involve your agent before problems become claims. Many sureties prefer early notice of a potential claim with a plan. You’ll want to bring your debt inventory, settlement plan, and current project schedule.
Can an MCA funder collect my receivables from the GC or project owner?
Short answer
Yes. If a funder has a valid lien and properly serves the proper UCC 9-406 notice, then yes. After that is done, the GC or project owner must pay the MCA funder. Remember, retainage is a receivable too! If you are unsure, ask for copies of the signed agreement and the UCC 1 filing. Public jobs may have rules pertaining to payment bonds that could impact who can receive payment.
UCC §9-406(a) says that once the account debtor gets a valid notice of the assignment, the account debtor will no longer be discharged of its obligation by paying the business. This means the account debtor (GC or project owner) might pay twice if they ignore the notice. This is why GCs and project owners tend to follow the instructions in the funder's letter.
Retainage is earned money that is not paid until the job is completed. Because it is a receivable, it can be redirected by the MCA funder upon release if the funder sends a notice.
Not every notice of assignment is valid. It's smart to ask the MCA funder for a copy of the signed contract and UCC 1 filing. Make sure the UCC filing is for the receivables. Here's more information on what to do about a UCC notice to your customers.
Public projects are more complicated. Many will have a payment bond, protecting suppliers and subcontractors. Different rules and deadlines will apply for those claims, so you'll want to get an attorney's advice before the funder's notice instructions and the claim on the bond instructions disagree on the same project. Be sure to inform the GC early so that an unexpected letter does not harm your relationship.
How do retainage and pay-when-paid push contractors into stacking MCAs?
Short answer
As a contractor, you pay for labor and materials upfront. Your payment from your client comes 60 to 90 days after you invoice them. The client also retains 10% of your payment until the job is complete. For example, on a job of $600,000, you have a maximum gap of almost $170,000 in month 2, and pay-when-paid clauses pass this delay in payments from GC to subcontractor. To make payroll, many contractors take a merchant cash advance, or MCA.
Our calculator assumes a single job and even monthly spending and billing. Each bill you submit is received 60 days later less a 10% retainage. All retainage is eventually paid when the job ends.
The largest funding gap is in month 2, at approximately $170,000. Payments do not start until month 3, so the gap slowly improves from there on. The funding gap does not become a positive number until the last payment, when the retainage is paid. The gap is 28.3% of the contract value. So the contractor carries this amount during the project, before receiving payment from the client.
Pay-when-paid clauses make things worse, allowing the GC to pay the subcontractor late because the owner paid the GC late. Still, you have to make payroll Friday.
During a contract, tariffs make the cash-flow pressure even worse. As steel and copper prices go up in the months after bidding, the cost of the job increases even though the contract price is fixed. The addition of an MCA in the gap month creates another cost to pay in the daily debit. When a second MCA is taken to fund the next job, the contractor starts stacking their MCAs. Learn more about whether to take another MCA to pay off your current one.
Is settlement better than bankruptcy, consolidation, or refinancing for a construction company?
Short answer
It really depends on four facts: Whether you have been sued, had an account frozen, or received a repossession notice. The percentage of deposits taken by MCA debits. Whether your creditors are willing to negotiate. Whether your business has the ability to fund lump sums. Business debt settlement usually makes sense when creditors are willing to negotiate and the cash is available. Subchapter V business bankruptcy may make sense if a creditor is unwilling to negotiate.
Legal action is the first thing you should look at. If you have been sued, your account frozen, or notice of repossession has been sent, then you need to talk to an attorney first and foremost.
If MCA debits are 20% of deposits or less, you may only need a reconciliation request or refinancing. Refinancing is when you get a longer-term loan to pay off the advances. See the options compared.
If your debits are higher and most creditors are willing to negotiate, settlement can often cut what is owed while projects are ongoing. If a funder is unwilling to negotiate, a Subchapter V can force holdouts to join. The debt limit is $7.5 million. This applies to cases filed on or after Nov 10, 2026 (H.R. 7730). You should speak to a bankruptcy attorney about how a filing may affect your bonds.
Refinancing is rarely available for a construction company with stacked MCAs because banks look for a stable cash flow and clear lien searches.
Reverse consolidation is not debt relief. It is getting a new advance to cover older debits for a short time. Overall repayment goes up. The decision guide that follows walks through these questions in order.
What should a construction owner do in the first 7 days of MCA trouble?
Short answer
In the first 7 days after trouble hits, you want to compile information and protect jobs. This means total up the MCA debits, inventory your positions, perform a UCC search, read everything you have signed, make sure payroll taxes, insurance, and equipment notes are current, and talk to your surety agent. Do not take out a new MCA to cover a gap month.
Below is a checklist of 9 steps, and a discussion of why they are important. Most owners can complete this within a week, relying on bank statements, contracts and job schedule.
Payroll taxes are top priority. Withheld payroll taxes are considered trust fund money. IRC §6672 says that a responsible person can be penalized an amount equal to the unpaid taxes if they willfully fail to pay them.
The surety call is especially important in construction. A surety who knows of trouble early, and has a plan, is in a better position to stand behind your bonding than a surety who finds out via a claim.
If you have been served with a lawsuit, or your account is frozen, then you skip ahead and call a licensed attorney. Your clock has started ticking when you were served.
Don’t take another advance to cover payroll this week. All that will do is create a new position and one more debit in the same draws. It may also violate your existing contract’s anti-stacking provision. Try to work with suppliers and the general contractor to schedule payment. A temporary delay, if agreed to in writing, costs much less than a new advance.
First 7 days of MCA trouble for a construction owner
- Why: these numbers will feed into a burden calculator and show the size of the problem.
- Why: no matter what options you pursue, you need a complete inventory of your debts and creditors.
- Why: each UCC-1 lien is an indication of a creditor with a claim on your assets (even the ones you forgot about).
- Why: these clauses determine how fast the funder acts and whether it can go after you personally.
- Why: trust fund money is subject to a Trust Fund Recovery Penalty, personal, under the IRC §6672.
- Why: secured lenders have repossession rights and insurance lapsing can stop your work.
- Why: the new position will create a new debit and make every solution harder.
- Why: this can lower the debit to actual sales without a lawsuit.
- Why: sureties look for liens and judgments. Early notice will help protect your bonding capacity.
Construction debt settlement FAQs
Can my MCA company take my retainage?
The answer is Yes if the MCA company has a valid lien against your accounts receivable. Since retainage is a type of accounts receivable, a valid UCC 9-406 notice from your MCA company to your GC or owner could direct your retainage to the funder upon release. To verify, you could request a copy of the signed contract and a copy of the UCC-1 filing from the funder. Read our article on UCC notices to customers.
Will settling my MCAs hurt my bonding capacity?
Yes, it can. Factors such as liens, judgments and financial statements will be reviewed by sureties, and in general, we believe that settled debts with releases and UCC-3 terminations tend to look better than unsettled lawsuits. It should be noted that a general indemnity agreement is an entirely separate promise that you are personally making, as well. We recommend reaching out to your surety agent early in the process.
Can my supplier file a lien on my project if I settle late?
The answer is possibly. Many suppliers have lien or bond claim rights against your project. Deadlines vary from state to state and whether it's a public or private job. In general, contractors should try to settle their debt before the deadlines in their area. We also recommend that the settlement agreement include a lien waiver that the supplier signs to release project claims upon payment.
What happens to my equipment during settlement?
The direct answer is that you can keep any financed or leased equipment as long as the loan payments are current. However, a secured lender can repossess the collateral post-default without going to court, so long as the repossession does not breach the peace (UCC §9-609). The collateral may be sold by the lender, in which case, the deficiency is typically settled for 30% to 60% of the deficiency amount. This is not guaranteed.
Do tariff price increases count as hardship?
Direct Answer: Tariff price increases could be used in your hardship file. The proof could include supplier invoices showing spikes in prices, letters notifying you of increases, and producer price data like AGC’s 27.6% figure for steel. The impact on a fixed-price job will illustrate why you lost money. Creditors ultimately make their own decisions, but evidence of hardship can help your settlement negotiations. It is no guarantee of a result.
How long does construction debt settlement take?
Direct Answer: Construction debt settlement typically takes 3 to 18 months overall. Each creditor moves at its own pace. Project timing also affects pace as retainage and final payments can be used to fund lump-sum offers. Being sued by a creditor can also delay the process. Make sure payroll taxes, insurance premiums, and bond premiums are current during your negotiation process.
Related questions
- How Do I Get Out of Merchant Cash Advance Debt? The Complete Guide
- MCA Company Sent a UCC Notice to My Customers — Can They Do That?
- What Happens If I Default on an Equipment Loan or Lease?
- How Do I Settle Unpaid Supplier Invoices Without Getting Sued?
- How Do I Request MCA Reconciliation to Lower My Daily Payment?
Sources
- Construction Inflation Alert, October 2026 — Associated General Contractors of America — agc.org/sites/default/files/users/user21902/Construction%20Inflation%20Alert%20Cover%20Oct — Checked Nov 2026
- Bankruptcies Rise 12.2 Percent, Jul 28, 2026 — U.S. Courts — uscourts.gov/data-news/judiciary-news/2026/07/28/bankruptcies-rise-122-percent — Checked Nov 2026
- UCC §9-406, Discharge of account debtor; notification of assignment — Cornell LII — law.cornell.edu/ucc/9/9-406 — Checked Nov 2026
- UCC §9-609, Secured party's right to take possession after default — Cornell LII — law.cornell.edu/ucc/9/9-609 — Checked Nov 2026
- UCC §9-513, Termination statement — Cornell LII — law.cornell.edu/ucc/9/9-513 — Checked Nov 2026
- 26 U.S.C. §6672, Trust Fund Recovery Penalty — Cornell LII — law.cornell.edu/uscode/text/26/6672 — Checked Nov 2026
- Instructions for Forms 1099-A and 1099-C — IRS — irs.gov/instructions/i1099ac — Checked Nov 2026
- H.R. 7730, Bankruptcy Threshold Adjustment Act — Congress.gov — congress.gov/bill/119th-congress/house-bill/7730 — Checked Nov 2026
- MCA Debt Settlement — Tayne Law Group, P.C. — attorney-newyork.com/mca-debt/mca-debt-settlement — Checked Nov 2026
- Merchant Cash Advance Settlement — CredibleLaw (attorney-referral network) — crediblelaw.com/merchant-cash-advance-settlement — Checked Nov 2026